Site surveys: We sent technicians to client locations to take photos, notes, and make estimations for materials needed.Here’s a breakdown of what we did throughout the project: The installation process involves several phases and moving parts. Our installations covered a lot of ground geographically, with store locations in over 850 different municipalities nationwide. Our peak install month was in March of 2019, when we installed new signage at 126 stores. Over a 23-month time period, our team internally coordinated the entire installation process, where we installed menu boards in 2,807 drive-thru lanes. Keyser was hired as an integrator for McDonald’s ODMB (Outdoor Menu Board) Project deployed nationwide starting in March of 2018. Integrated digital display systems: The outdoor menu board project Keep reading for the full details on how we did it, our process, and what we learned throughout this project. For a nearly two-year period, Keyser was heavily involved in this Outdoor Menu Board Installation Project, completing 5,500 McDonald’s digital menu board installations.Īfter working with the most enduring and successful fast-food chain in the US, we’re confident in saying that the installation of drive-thru menus is something we’re good at. Back in 2018, it was big industry news when McDonald’s installed thousands of brand-new digital menu boards.